What is the best way to install the t molding for the transition from wood to ceramic and wood to marble.
Install laminate t molding concrete.
If your sub floor is it s a lot easier to install the track.
Step 1 measure the width of the doorway between the floors.
New guy post subject.
Pre fit the t moulding to make sure it fits right up against the tiles.
In an opening with a door you want the molding to be directly under the.
Most of the transition moldings come with a track that needs to be fixed to the floor first.
The molding should be in full contact with the adhesive.
Step 2 always measure twice before cutting the t molding strip.
There are a couple of ways to install your t molding screwing or gluing.
Installing laminate transitions t mold on concrete.
Here are a few tips for installing t molding for laminate flooring.
Use a miter saw or power saw for a cleaner cut.
Fri mar 03 2006 11 37 am.
I m thinking of using liquid nail to glue the t molding to the concrete subfloor.
What do you think.
Cut a wood shim to fill the gap between the bottom of the molding and the subfloor.
Then put in the t moulding and press it up to the tiles.
Laminate flooring is one of the least expensive floor coverings available.
If your t molding uses a metal track measure and cut it with tin snips.
How to install laminated flooring transition molding.
Thanks for you replys.
The placement of the molding needs to be considered beforehand.
Often referred to as a floating floor because it does not attach to.
The glue down method.
The molding should push into the adhesive to flatten it out.
Ifloor shows you how to install a t molding between your floors or in doorways between two types of flooring.
Make sure you have 1 2 to 3 4 inch of space with no glue so it doesn t touch the laminate.